Weld On Frame Support (2015-22 Colorado/Canyon)
This weld on mount reinforces the rear frame rails, in a known weak spot, on the 2nd gen Colorado and Canyon.
The bracket is made from .125 CR A36 CNC laser cut and bent steel. The wrap around design bridges the arch in the frame rail and supports the frame at it's weakest spot. Welding is required.
- Fits 2015-22 Colorado and Canyon, including ZR2
-
Sold in pairs (Order of 1 = 2 brackets for 1 truck)
- Requires Modifications to fit with Bison Fuel Tank Skid
- Welding required
- Works with Ultimate and Standard Relocation Kits
- 2-4 hour estimated install time
- Brackets ship bare metal
- For off-road use only. Use at your own risk
- Made in USA
- Installation Instructions
**This product is designed for Off-Road Use only. Welding anything to the frame of your vehicle should be done by a professional welder with knowledge of welding on modern vehicles. Installing this product may alter the vehicles performance from it's OEM standard. Do not exceed your vehicles OEM Payload limits.
Inventory Status and Definitions
In-Stock - Item is in stock and ready for shipping. Please allow 5-7 business days for the order to be shipped. Orders are shipped in the order they are received.
Pre-Order - Pre-order items are new products. Items become available as "Pre-Order" when a batch is in the queue to be manufactured, allowing customers to order and reserve the product before it is ready to ship. Please allow 4-6 weeks, from when your order is placed, for the "Pre-Order" item to ship.
Backordered - Items will be marked as "Back-Order" when the item is out of stock, but is "in process" of being manufactured. Allowing customers to reserve an item before it is ready to ship. Please allow 2-3 weeks, from when your order is placed, for the "Backordered" item to ship. Some items listed as "Backordered" may be Built to Order. Please look at the item description.
Out of Stock - Item is not in stock and not available for purchase.
Built to Order - Item begins the manufacturing process when order is received. Typically components are stocked, but the item isn't sent to welding/assembly until an order is received. Please allow 13-15 weeks for "Built to Order" items to be shipped.
September 2024: Built to Order Status updated to 13-15 weeks for items to be shipped.